A fast and efficient way to produce a clean lined excavation in either normal or contaminated land, ready to accept the pre-fabricated reinforcement cage. There is no need for extra equipment, Pecafil® arrives on site, ready for installation.
Using U-section Pecafil® beam units with an additional depth construction tolerance reduces overdig. Minimum working space requirement reduces spoil off site and allows excavated meterial, where acceptable, to be used as backfill. This makes Pecafil® the fastest, most cost-effective, in-ground construction formwork solution for piled foundations.
Pecafil® U-section beam units can be used, in conjunction with system accessories, to construct beams on ground.